Existing
Manufacturing Facilities
1)
DRI Kiln
The company has successfully
commissioned both of its DRI
Kiln Capacity 350 TPD each
and they We are
manufacturing high quality
Sponge Iron with FEM 85 % by
using high quality Iron Ore
and washed coal with higher
FC and low ash percentages
2)
Power Plant
The Company has successfully
installed its first power
plant of 25 MW and it is now
operating at full capacity.
The power plant requires
continuous supply of water
for which the company has
successfully installed a 9
KM pipe line from the intake
point in the Hirakud
reservoir to the reservoir
in the plant within a record
time frame of 7 months. The
power produced is being used
in the rolling mill and in
the SMS shop and the company
is exporting its surplus
power to Gridco which is
adding substantial revenue
to the company.
3)
Coal Washery
During the current financial
year the company has
installed a state of art
Coal Washery with heavy
media technology which is
one of the most unique in
the country and this has
enabled the company to use
the low grade coal which is
locally available. Washed
coal is being used by DRI
Plant and the meddling and
rejects is used by the power
plant which ensures
substantial savings to the
cost of production and good
quality products.
4)
SMS Plant
The company has successfully
commissioned its induction
furnaces and two strand
billet caster. We are making
special quality of billets
and blooms of various sizes
and these billets and blooms
are in heavy demand across
the country which has
ensured higher realization
than our competitors. We are
also making special quality
of steel for premium
structural which is utilized
by the power industries and
has a very high demand.
5)
Rolling Mill
We have commissioned our
Rolling Mill in the current
Financial Year and within
three months of
commissioning the Rolling
Mill we have already started
capturing the markets of
Orissa and selling our
products under the brand
name of 'SEL THERMEX TMT
BARS’.
The Company has been awarded
the ISO certification. The
company is maintaining a
strict check on the quality
which has enabled it to
fetch higher premium in the
market.

The company is implementing
various project as under
which are expected to be
completed in the next 12 to
18 months.
- 200000 - 260000
tonnes DRI Kiln annum by
using pre-heating
technology.
- 20 MW - 60 MW
Captive Power Plant
- 30000 MVA Ferro
Alloys plant.
- Increase the SMS
capacity from 2.5L to
3L.
The company also
plant to install Arc
furnace and AOD Plant to
manufacturing specialty
Steel for re-use in the
automobile sector, Power
sector and exports the
same. |